Before Laminate Installation
Here is what you should expect before your laminate installation with us:
- Remove all furniture from the rooms in question.
- You should also consider if your old flooring will need to be removed.
- Complete any painting work.
- Have a waste management plan.
- Ensure pets or children are not present.
- We will complete a walkthrough with you to answer any questions that you might have.
During Laminate Installation
Here is what you can expect during your laminate installation with us:
- Laminate planks may need to be acclimated to the room's temperature.
- Our crew will trim door jambs and install the underlayment.
- Laminate floors will be connected using an interlocking system, "a floating floor," while others may require an adhesive. Installation timelines will vary depending on which of these methods are used. This will be discussed before the installation.
- We will cleanup and assess the work.
After Laminate Installation
After your laminate installation with us, you can expect the following:
- Your crew will walk you through the installation, answering any questions that you might have.
- Run a fan for 24 hours to remove unwanted smells.
- Allow the materials to settle before walking across your new flooring.
- Contact us as needed.